The critical path in a project network is: A. The Shortest path through the network. B. Longest path through the network. C. Network path with the most difficult activities. D. Network path using the most resources.

ansver
Answers: 2

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 04:30, fatherbamboo
Dr. wisteria is a prominent chiropractor in the chicago area. she wants to provide a forum for her patients to discuss their health concerns and to seek and offer advice to other patients. which telecommunications tool is most appropriate for dr. wisteria's needs?
Answers: 3
image
Computers and Technology, 22.06.2019 15:00, taylorsamodell3217
Who is the first president to use social media as part of his campaign strategy
Answers: 1
image
Computers and Technology, 22.06.2019 22:50, youngboymark123
Assume the existence of a bankaccount class. define a derived class, savingsaccount that contains two instance variables: the first a double, named interestrate, and the second an integer named interesttype. the value of the interesttype variable can be 1 for simple interest and 2 for compound interest. there is also a constructor that accepts two parameters: a double that is used to initialize the interestrate variable, and a string that you may assume will contain either "simple", or "compound", and which should be used to initialize the interesttype variable appropriately. there should also be a pair of functions getinterestrate and getinteresttype that return the values of the corresponding data members (as double and int respectively).
Answers: 2
image
Computers and Technology, 23.06.2019 01:30, solikhalifeoy3j1r
In deadlock avoidance using banker’s algorithm, what would be the consequence(s) of: (i) a process declaring its maximum need as maximum possible for each resource. in other words, if a resource a has 5 instances, then each process declares its maximum need as 5. (ii) a process declaring its minimum needs as maximum needs. for example, a process may need 2-5 instances of resource a. but it declares its maximum need as 2.
Answers: 3
You know the right answer?
The critical path in a project network is: A. The Shortest path through the network. B. Longest path...

Questions in other subjects:

Konu
Chemistry, 24.08.2019 09:20
Konu
Mathematics, 24.08.2019 09:20