Computers and Technology, 27.02.2020 20:47 trinitieu66
Public static String getVerticalBars(int maxRows, int maxCols, int bars, char color1, char color2, char color3) -
This method returns a string with a number of vertical bars that correspond to the bars parameter. To compute the size of each vertical bar, divide maxCols by the specified number of bars. The first vertical bar will use color1, the second color2, and the third color3. If more than 3 bars are present, we will start again with color1. If the computed size for a vertical bar is less than 1, or any of the colors is invalid, the method will return null and no diagram will be generated. The method MUST not rely on System. out. println() and must not use Array or Arraylists. For example, calling DrawingApp. getVerticalBars(10, 12, 3, 'R', 'G', 'B'); will generate the string:
Answers: 1
Computers and Technology, 24.06.2019 00:30, sethhdoty
Use the keyword strategy to remember the meaning of the following word. the meaning for the word has been provided. write your keyword and describe the picture you would create in your mind. obfuscate: to make something so confusing that it is difficult to understand.
Answers: 2
Computers and Technology, 24.06.2019 02:00, akatherine1738
What is a loop? a. a collection of function definitions at the top of a program b. a line of code that defines a variable and assigns it a value c. a program that opens the turtle graphics window d. a block of code that repeats a specific number of times
Answers: 1
Computers and Technology, 24.06.2019 13:30, sweeps8758
Which type of excel chart should be used to track students’ progress on test grades? line column bar pie
Answers: 2
Public static String getVerticalBars(int maxRows, int maxCols, int bars, char color1, char color2, c...
Mathematics, 14.11.2020 18:40
History, 14.11.2020 18:40
English, 14.11.2020 18:40
Arts, 14.11.2020 18:40
Mathematics, 14.11.2020 18:40
SAT, 14.11.2020 18:40
Mathematics, 14.11.2020 18:40
History, 14.11.2020 18:40