Computers and Technology, 20.02.2020 03:11 ale1910
Triathlon Competitor Scheduling You are trying to schedule triathlon contestants so that the triathlon completes as early in the day as possible. (The triathlon completes when all the contestants are done.) Each contestant has a projected swimming time, running time, and biking time. Since the pool is very small only one contestant can be in the pool at a time. Any number of contestants can be biking and running at the same time. The contestants first swim, then bike, and finally run. Assuming that each contestant will complete each event in their projected time, what is the best order to send the people out, if you want the whole competition to be over as soon as possible? That is, give and efficient algorithm that produces a schedule whose completion time is as early as possible. A. Specify an efficient greedy algorithm to achieve the goal of earliest completion of the competition. B. Prove your algorithm always finds the optimal solution. C. Analyze your algorithm's complexity.
Answers: 2
Computers and Technology, 22.06.2019 22:10, Metlife
Asequential circuit contains a register of four flip-flops. initially a binary number n (0000 ≤ n ≤ 1100) is stored in the flip-flops. after a single clock pulse is applied to the circuit, the register should contain n + 0011. in other words, the function of the sequential circuit is to add 3 to the contents of a 4-bit register. design and implement this circuit using j-k flip-flops.
Answers: 1
Computers and Technology, 23.06.2019 00:30, hannahrasco4051
Pl i need the answer now ! which one of the following is considered a peripheral? a software b mouse c usb connector d motherboard
Answers: 1
Triathlon Competitor Scheduling You are trying to schedule triathlon contestants so that the triathl...
History, 18.10.2020 22:01
Arts, 18.10.2020 22:01
Mathematics, 18.10.2020 22:01
Mathematics, 18.10.2020 22:01
Mathematics, 18.10.2020 22:01
Mathematics, 18.10.2020 22:01
Business, 18.10.2020 22:01
English, 18.10.2020 22:01