While working alone at their constant rates computer x can process 240 files in 4 hours, and comp y 240 files in 8 hrs. if all files processed by these comp. are the same size how long would it take the two comp. working at the same time at their respective constant rates , to process a total of 240 files?
a. 2hrs
b. 2hrs 20 min
c. 2hrs 40 min
d. 6hrs
e. 6hrs 20 min

ansver
Answers: 1

Other questions on the subject: Computers and Technology

image
Computers and Technology, 21.06.2019 18:40, Maelynne8515
Access defaults to searching for information on the
Answers: 1
image
Computers and Technology, 22.06.2019 18:00, Geo777
Suppose an astronomer discovers a large, spherical-shaped body orbiting the sun. the body is composed mostly of rock, and there are no other bodies sharing its orbit. what is the best way to categorize this body? a. planet b. moon c. comet d. asteroid
Answers: 1
image
Computers and Technology, 23.06.2019 00:30, vane3152
If joey was single and his taxable income was $9,500, how much would he pay in taxes each year?
Answers: 1
image
Computers and Technology, 23.06.2019 06:00, jack487
How can a user delete a drawing object
Answers: 1
You know the right answer?
While working alone at their constant rates computer x can process 240 files in 4 hours, and comp y...

Questions in other subjects:

Konu
Chemistry, 01.07.2020 15:01