subject

What is the big-o performance estimate of the following function?
int f (n) {
int sum = 0;
for (i = 0; i < n; i = 7 * i)
sum += i;
return sum;
} // end f

ansver
Answers: 1

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 10:30, icantspeakengles
Aconstruction company is creating a powerpoint presentation describing how they calculate costs during each construction step. they plan to email this presentation to clients. the individual clients will be watching the presentation slide show on their own personal computers. what is the most important formatting step the company should take to make the text readable and pleasing to the eye?
Answers: 2
image
Computers and Technology, 22.06.2019 14:30, chaparro0512
Create a pseudocode design to prompt a student for their student id and the titles of the three classes they want to add. the solution should display the student’s id and a total bill. • bill a student using the following rules: o students can only add up to 3 classes at a time.
Answers: 3
image
Computers and Technology, 23.06.2019 08:30, sofigaviria05
All of these are true about using adhesive except: a. dissimilar materials can be joined. b. mixing tips are product and material specific. c. a specific application gun may be required. d. two-part adhesives are dispensed using two mixing tips
Answers: 3
image
Computers and Technology, 23.06.2019 15:30, PlzNoToxicBan
The song about casey jones a railroad engineer who gives his life on the job would most likely gall under the folk song category of? a-work song b-nonsense song c-religious song d-ballad
Answers: 1
You know the right answer?
What is the big-o performance estimate of the following function?
int f (n) {
int sum =...

Questions in other subjects:

Konu
Mathematics, 05.11.2020 18:40
Konu
Mathematics, 05.11.2020 18:40