In the middle of the iteration, how should a team handle requirement changes from the customer? (1 correct answer)
1. the team should never incorporate any changes during an ongoing iteration?
2. the team can always take up the changes and extend iteration duration, if needed.
3. the team may accept the changes in exchange of existing work item(s), if the facilitator/lead conveys the criticality of the changes.
4. the team may re-negotiate with the product owner provided the changes do not endanger the iteration goal.

ansver
Answers: 3

Other questions on the subject: Computers and Technology

image
Computers and Technology, 21.06.2019 14:00, jjackson0010
When designers make compromises during the engineering design process the result is often what?
Answers: 1
image
Computers and Technology, 23.06.2019 18:20, Blossom824
What is wi-fi infrastructure? a metropolitan area network that uses radio signals to transmit and receive data a communications technology aimed at providing high-speed wireless data over metropolitan area networks a means by which portable devices can connect wirelessly to a local area network, using access points that send and receive data via radio waves includes the inner workings of a wi-fi service or utility, including the signal transmitters, towers, or poles and additional equipment required to send out a wi-fi signal
Answers: 2
image
Computers and Technology, 24.06.2019 22:30, toricepeda82
What are the 4 basic items that are traded throughout the world?
Answers: 1
image
Computers and Technology, 25.06.2019 04:30, almaromeroo13
Consider a list of full names formatted “firstname lastname”, like ["jules verne", "alexandre dumas", "maurice druon"]. write a list comprehension that produces a list with the full names in the format “lastname, firstname”. the resulting list should look like ['verne, jules', 'dumas, alexandre', 'druon, maurice']. the simplest solution may involve a nested comprehension: [ …. for … in [ … for … in … ]].
Answers: 3
You know the right answer?
In the middle of the iteration, how should a team handle requirement changes from the customer? (1...

Questions in other subjects:

Konu
Mathematics, 04.12.2019 08:31