subject
Chemistry, 22.04.2021 16:20 sunshine210421

SHOW ALL WORK TO THE BEST OF YOUR ABILITY FOR FULL CREDIT An object weighing 5.54 kilograms is moving at a velocity of 3.0 m/s before moving down the mountain and
reaching a final speed of 5.3 m/s. It took 0.5 hours to travel 12 kilometers to reach this new speed.
1. How much Work was done over this time?
2. Over those 0.5 hours, how much Power was used during this acceleration period moving down the
mountain.
Edit View Insert Format Tools Table
12pt
Paragraph
В І
U
3
2TM

ansver
Answers: 3

Other questions on the subject: Chemistry

image
Chemistry, 22.06.2019 09:20, pandaman632
What happened to the amount of carbon dioxide in the atmosphere from 2010–2017?
Answers: 1
image
Chemistry, 22.06.2019 22:30, boss1373
Why is it possible for different microorganisms to extract energy not only from carbohydrates and other biological molecules but from a large variety of substances?
Answers: 1
image
Chemistry, 23.06.2019 02:30, hailee232
When the ionic compound nabr dissolves in water, br– ions are pulled into solution by the attraction between what two particles? a. the na+ and br– ions b. the na+ ion and the negative end of a water molecule c. the br– ion and the positive end of a water molecule d. the br– ion and the negative end of a water molecule
Answers: 1
image
Chemistry, 23.06.2019 06:20, cowboo5000pcl655
An object of mass 10.0 kg and volume 1000 ml and density 10 g/ml sinks in water who’s density is 1.0 g/ml. what is the mass of the water which has been displaced in kilograms
Answers: 1
You know the right answer?
SHOW ALL WORK TO THE BEST OF YOUR ABILITY FOR FULL CREDIT An object weighing 5.54 kilograms is mov...

Questions in other subjects:

Konu
Mathematics, 06.01.2021 22:00
Konu
Social Studies, 06.01.2021 22:00
Konu
Health, 06.01.2021 22:00
Konu
Arts, 06.01.2021 22:00