A pharmaceutical company wants to test the efficiency of its new drug production techniques so they run 3 shifts of production for 4 hours each and collect the product at the end of each shift. Their chemical engineers predict a maximum of 7000 grams of product can be created each
shift.
Shift one produces 4562 grams.
Shift two produces 5783 grams.
Shift three produces 5247 grams.
What is the average percent yield for this new production technique?
A. 51.97%
B. 82.61%
C. 74.25%
D. 74.95%

ansver
Answers: 1

Other questions on the subject: Chemistry

image
Chemistry, 22.06.2019 11:00, pindu
An object becomes electrically charged when: electrons are created in it electrons from it are destroyed electrons are transferred to it protons from it are destroyed protons are created in it
Answers: 1
image
Chemistry, 22.06.2019 15:30, abdullaketbi71
What best discribes the relationship between wavelength and frequency in a electromagnetic wave
Answers: 1
image
Chemistry, 22.06.2019 17:10, hahahwha
Acalorimeter is to be calibrated: 51.203 g of water at 55.2 degree c is added to a calorimeter containing 49.783 g of water at 23.5c. after stirring and waiting for the system to equilibrate, the final temperature reached is 37.6 degree c. specific heat capacity of water (s = 4.18 j/g∙degree c). calculate the calorimeter constant. (smδt)warm water = -[(smδt)cold water + (calorimeterδtcold water)]
Answers: 2
image
Chemistry, 22.06.2019 23:00, Kykebailey2356
Which of two curves exhibits exponential growth
Answers: 1
You know the right answer?
A pharmaceutical company wants to test the efficiency of its new drug production techniques so they...

Questions in other subjects:

Konu
Mathematics, 29.03.2021 19:30
Konu
English, 29.03.2021 19:30
Konu
Mathematics, 29.03.2021 19:30