Chemistry, 16.10.2019 21:30 bananaslada
The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard time, the pfd allowance factor is 12%, and the machine allowance factor is 25%. the work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) during an 8-hour shift, the worker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. what was the worker's pace on the operator-controlled portion of the shift?
Answers: 2
Chemistry, 22.06.2019 00:30, megaaan214p61pb7
Which compounds have the empirical formula ch2o? a. c2h4o2 b. c3h6o3 c. ch2o2 d. c5h10o5 e. c6h12o6
Answers: 3
Chemistry, 22.06.2019 22:00, robert7248
All of the following are homogeneous mixtures except a) sugar dissolved in water. b) orange juice. c) coffee with cream. d) household vinegar. e) apple juice
Answers: 1
The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard ti...
Mathematics, 23.03.2021 14:00
Mathematics, 23.03.2021 14:00
History, 23.03.2021 14:00
Chemistry, 23.03.2021 14:00
Chemistry, 23.03.2021 14:00
Physics, 23.03.2021 14:00
Mathematics, 23.03.2021 14:00
Mathematics, 23.03.2021 14:00
Chemistry, 23.03.2021 14:00