The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the desired schedule, it will:

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 21:00, nwalker916
12. nelson corporation, which has only one product, has provided the following data concerning its most recent month of operations: selling price $ 115 units in beginning inventory 380 units produced 5,900 units sold 6,070 units in ending inventory 210 variable costs per unit: direct materials $ 46 direct labor $ 27 variable manufacturing overhead $ 3 variable selling and administrative $ 12 fixed costs: fixed manufacturing overhead $ 112,100 fixed selling and administrative $ 36,420 the company produces the same number of units every month, although the sales in units vary from month to month. the company's variable costs per unit and total fixed costs have been constant from month to month. a. prepare a contribution format income statement for the month using variable costing. unit product cost under variable costing direct materials direct labor variable manufacturing overhead variable costing unit product cost (formula)
Answers: 3
image
Business, 22.06.2019 01:00, jonzyjones3114
Bond x is noncallable and has 20 years to maturity, a 7% annual coupon, and a $1,000 par value. your required return on bond x is 10%; if you buy it, you plan to hold it for 5 years. you (and the market) have expectations that in 5 years, the yield to maturity on a 15-year bond with similar risk will be 9.5%. how much should you be willing to pay for bond x today? (hint: you will need to know how much the bond will be worth at the end of 5 years.) do not round intermediate calculations. round your answer to the nearest cent.
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 20:00, gudtavosanchez19
After testing its water, a city water department issues a report to the related citizens, noting what chemicals have been identified, their doses, and the estimated risks of exposure at these levels. this report represents a type of
Answers: 1
You know the right answer?
The 15-15 Rule states that if a project is more than 15 percent over budget or 15 percent off the de...

Questions in other subjects: