subject
Business, 09.12.2021 04:20 ineedhelp2285

Your firm has a potential project that will cost $5,000 now to begin. The project will then generate after-tax cash flows of $900 at the end of the next three years and then $1400 per year for the three years after that. If the discount rate is 8% then what is the PI

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 10:20, mia7955
Asmartphone manufacturing company uses social media to achieve different business objectives. match each social media activity of the company to the objective it the company achieve.
Answers: 3
image
Business, 22.06.2019 13:00, shayneseaton
Reliability and validity reliability and validity are two important considerations that must be made with any type of data collection. reliability refers to the ability to consistently produce a given result. in the context of psychological research, this would mean that any instruments or tools used to collect data do so in consistent, reproducible ways. unfortunately, being consistent in measurement does not necessarily mean that you have measured something correctly. to illustrate this concept, consider a kitchen scale that would be used to measure the weight of cereal that you eat in the morning. if the scale is not properly calibrated, it may consistently under- or overestimate the amount of cereal that’s being measured. while the scale is highly reliable in producing consistent results (e. g., the same amount of cereal poured onto the scale produces the same reading each time), those results are incorrect. this is where validity comes into play. validity refers to the extent to which a given instrument or tool accurately measures what it’s supposed to measure. while any valid measure is by necessity reliable, the reverse is not necessarily true. researchers strive to use instruments that are both highly reliable and valid.
Answers: 1
image
Business, 22.06.2019 19:30, jcastronakaya
When it is 4: 00 a. m. in halifax, it is 1: 00 p. m. in karachi, and when it is 9: 00 a. m. in karachi, it is 5: 00 a. m. in warsaw. mary left halifax to fly to karachi, but she accidentally left her watch on warsaw time. according to mary’s watch, she left halifax at 9: 40 p. m. on monday. the local time when she arrived at karachi was 3: 00 p. m. tuesday. how long was mary’s flight? a. 9 hours, 20 minutes b. 13 hours, 20 minutes c. 14 hours, 20 minutes d. 17 hours, 20 minutes
Answers: 1
image
Business, 22.06.2019 20:20, dd123984
Levine inc., which produces a single product, has prepared the following standard cost sheet for one unit of the product. direct materials (9 pounds at $1.80 per pound) $16.20 direct labor (6 hours at $14.00 per hour) $84.00 during the month of april, the company manufactures 270 units and incurs the following actual costs. direct materials purchased and used (2,500 pounds) $5,000 direct labor (1,660 hours) $22,908 compute the total, price, and quantity variances for materials and labor.
Answers: 2
You know the right answer?
Your firm has a potential project that will cost $5,000 now to begin. The project will then generate...

Questions in other subjects:

Konu
Mathematics, 03.03.2020 02:00