Business, 25.10.2021 04:30 komari0217
4. Define equilibrium price, demand schedule, and supply schedule. Then, briefly explain how demand and supply schedules are used to find the equilibrium price. (4 points)
Answers: 2
Business, 22.06.2019 06:30, hannahroswall1
Ummit record company is negotiating with two banks for a $157,000 loan. fidelity bank requires a compensating balance of 24 percent, discounts the loan, and wants to be paid back in four quarterly payments. southwest bank requires a compensating balance of 12 percent, does not discount the loan, but wants to be paid back in 12 monthly installments. the stated rate for both banks is 9 percent. compensating balances will be subtracted from the $157,000 in determining the available funds in part a. a-1. calculate the effective interest rate for fidelity bank and southwest bank. (do not round intermediate calculations. input your answers as a percent rounded to 2 decimal places.) a-2. which loan should summit accept? southwest bank fidelity bank b. recompute the effective cost of interest, assuming that summit ordinarily maintains $37,680 at each bank in deposits that will serve as compensating balances
Answers: 1
Business, 22.06.2019 17:50, hinokayleen5053
Which of the following is an element of inventory holding costs? a. material handling costs b. investment costs c. housing costs d. pilferage, scrap, and obsolescence e. all of the above are elements of inventory holding costs.
Answers: 1
Business, 22.06.2019 19:20, dayday0
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
4. Define equilibrium price, demand schedule, and supply schedule. Then, briefly explain how demand...
Mathematics, 21.02.2022 05:10
Mathematics, 21.02.2022 05:10
Computers and Technology, 21.02.2022 05:10
Chemistry, 21.02.2022 05:10
English, 21.02.2022 05:10
Business, 21.02.2022 05:10
Mathematics, 21.02.2022 05:10
Mathematics, 21.02.2022 05:20