The objectives of the internal control structure for a production cycle are to provide assurance that transactions are properly executed and recorded, and that: a. independent internal verification of activity reports is established.
b. transfers to finished goods are documented by a completed production report and a quality control report.
c. production orders are pre-numbered and signed by a supervisor.
d. custody of work in process and of finished goods is properly maintained.

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 22:40, itscheesycheedar
In allentown, pennsylvania, in the summer of 2014, the average price of a gallon of gasoline was $3.68long dasha 22-cent increase from the year before. many consumers were upset by the increase. one was quoted in a local newspaper as saying, "it's crazy. the government should step in." source: sam kennedy, "valley feeling pain at the pump," (allentown, pa) morning call, june 21, 2014. suppose the government had stepped in and imposed a price ceiling equal to old price of $3.46 per gallon. a. using the line drawing tool, draw and label the price ceiling. carefully follow the instructions above, and only draw the required object.
Answers: 3
image
Business, 22.06.2019 11:00, smartie80
Why does an organization prepare a balance sheet? a. to reveal what the organization owns and owes at a point in time b. to reveal how well the company utilizes its cash c. to calculate retained earnings for a given accounting period d. to calculate gross profit for a given accounting period
Answers: 1
image
Business, 22.06.2019 11:50, Paytonsmommy09
Which of the following does not offer an opportunity for timely content? evergreen content news alerts content that suits seasonal consumption patterns content that matches a situational trigger content that addresses urgent pain points
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
The objectives of the internal control structure for a production cycle are to provide assurance tha...

Questions in other subjects: