subject
Business, 07.07.2021 01:10 elenasoaita

If you could invent something what would it be

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 21:30, strikeboystorm
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
image
Business, 21.06.2019 23:00, AshlynPlayz45
The monthly payment m of a loan of amount p for y years with an interest rate r can be calculated by the formula: m = p(r/12) 1 â’ (1 + r/12)â’12y calculate the monthly payment and the cummulative total payment for a $100,000 loan with an interest rate of 4.85% if taken out for 10 years, for 11 years, etc., up to a 30 year term. display the results in a three-column table where the first column is the number of years, the second is the monthly payment, and the third is the cummulative total payment. note: use format bank; for this problem. also, remember to represent the interest rate as a decimal (e. g. 0.0485) 2. a torus-shaped water tube is designed to have a volume of 8, 000in3 . the volume of the tube, v , and its surface area, s, are given by: v = 1 4 ď€ 2 (a + b)(b â’ a) 2 s = ď€ 2 (b 2 â’ a 2 ) if a = kb, determine s, a, and b for k = 0.2, 0.3, 0.7. display the results in a table
Answers: 1
image
Business, 22.06.2019 11:40, avagracegirlp17zx2
On january 1, 2017, sophie's sunlounge owned 4 tanning beds valued at $20,000. during 2017, sophie's bought 3 new beds at a total cost of $14 comma 000, and at the end of the year the market value of all of sophie's beds was $24 comma 000. what was sophie's net investment
Answers: 3
image
Business, 22.06.2019 20:30, Arealbot
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game. expert answer
Answers: 3
You know the right answer?
If you could invent something what would it be...

Questions in other subjects: