Answers: 1
Business, 22.06.2019 03:40, lexybellx3
Apharmaceutical packaging company (ppc) has decided to reorganize its processes into cells. the company has four different production operations, each requiring a unique piece of equipment. the names and functions of the four pieces of equipment are sort, count, place, and package. the company packages five different families of products (a, b, c, d, and e). the tables below indicate the demand (total units/day by product family), required operations, and operation cycle times for each product family. assume that any individual piece of equipment is available to operate 16 hours/day, but 2 hours (in total) are lost each day on each piece of equipment due to breaks and meetings when operators are not available to operate the equipment. how many minutes/day are available for production
Answers: 3
Business, 22.06.2019 18:30, miller5452
Amanufacturer has paid an engineering firm $200,000 to design a new plant, and it will cost another $2 million to build the plant. in the meantime, however, the manufacturer has learned of a foreign company that offers to build an equivalent plant for $2,100,000. what should the manufacturer do?
Answers: 1
Business, 22.06.2019 19:30, jcastronakaya
When it is 4: 00 a. m. in halifax, it is 1: 00 p. m. in karachi, and when it is 9: 00 a. m. in karachi, it is 5: 00 a. m. in warsaw. mary left halifax to fly to karachi, but she accidentally left her watch on warsaw time. according to mary’s watch, she left halifax at 9: 40 p. m. on monday. the local time when she arrived at karachi was 3: 00 p. m. tuesday. how long was mary’s flight? a. 9 hours, 20 minutes b. 13 hours, 20 minutes c. 14 hours, 20 minutes d. 17 hours, 20 minutes
Answers: 1
Business, 23.06.2019 00:00, SoccerHalo
Todd and jim learned that in building a business plan, it was important for them to:
Answers: 1
What do you mean by agriculture related profession...
Mathematics, 22.01.2020 18:31
Mathematics, 22.01.2020 18:31
Mathematics, 22.01.2020 18:31