Adil was promoted to that position because he was the best design engineer in the company and was ambitious to further his career by going into management At the time. Adil had little understanding of what the job would be like,
but he saw it as both an opportunity and a challenge. Adil grew up as somewhat of a
loner. He still feels awkward around people he doesn't know well and he dislikes social functions such as cocktail parties and company picnics. As a design
engineer, Adil
preferred assignments where
he could work alone rather than team projects. He is impatient with bureaucratic authority figures, and he is critical
of corporate policies that he regards as too restrictive. Adil gets along well with his present boss, because he is left alone to run his engineering group in his own
way. Adil likes challenging assignments and he tries to save the most difficult and interesting design projects for himself. Although Adil usually performs these
tasks effectively, his preoccupation with them sometimes takes time away from some of his managerial responsibilities, such as developing and mentoring
subordinates. What are the dominant motives for Adil?
A) Need for power
B) Need for Affiliation
C) Need for Achievement
D) Need for money,

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 14:00, Marcynandrew
The new york stock exchange is an example of physical or individual
Answers: 2
image
Business, 22.06.2019 10:00, heavendl13
In a chapter 7 bankruptcy, a debtor:
Answers: 2
image
Business, 22.06.2019 15:00, cheyfaye4173
Oerstman, inc. uses a standard costing system and develops its overhead rates from the current annual budget. the budget is based on an expected annual output of 120,000 units requiring 480,000 direct labor hours.(practical capacity is 500,000 hours)annual budgeted overhead costs total $772,800, of which $556,800 is fixed overhead. a total of 119,300 units, using 478,000 direct labor hours, were produced during the year. actual variable overhead costs for the year were $260,400 and actual fixed overhead costs were $555,450.required: 1. compute the fixed overhead spending variance and indicate if favorable or unfavorable.2. compute the fixed overhead volume variance and indicate if favorable or unfavorable.
Answers: 3
image
Business, 22.06.2019 17:50, adamflex
Variable rate cd’s = $90 treasury bills = $150 discount loans = $20 treasury notes = $100 fixed rate cds = $160 money market deposit accts. = $140 savings deposits = $90 fed funds borrowing = $40 variable rate mortgage loans $140 demand deposits = $40 primary reserves = $50 fixed rate loans = $210 fed funds lending = $50 equity capital = $120 a. develop a balance sheet from the above data. be sure to divide your balance sheet into rate-sensitive assets and liabilities as we did in class and in the examples. b. perform a standard gap analysis and a duration analysis using the above data if you have a 1.15% decrease in interest rates and an average duration of assets of 5.4 years and an average duration of liabilities of 3.8 years. c. indicate if this bank will remain solvent after the valuation changes. if so, indicate the new level of equity capital after the valuation changes. if not, indicate the amount of the shortage in equity capital.
Answers: 3
You know the right answer?
Adil was promoted to that position because he was the best design engineer in the company and was am...

Questions in other subjects:

Konu
Mathematics, 18.08.2019 10:30