EcoFabrics has budgeted overhead costs of $1,039,500. It has allocated overhead on a plantwide basis to its two products (wool and cotton) using direct labor hours which are estimated to be 495,000 for the current year. The company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. These two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). Overhead allocated to the cutting cost pool is $396,000 and $643,500 is allocated to the design cost pool. Additional information related to these pools is as follows. Wool Cotton Total
Machine hours 110,000 110,000 220,000
Number of setups 1,100 550 1,650
1. Calculate the overhead rate using activity based costing.
2. Determine the amount of overhead allocated to the wool product line and the cotton product line using activity-based costing.
3. Calculate the overhead rate using traditional approach.
4. What amount of overhead would be allocated to the wool and cotton product lines using the traditional approach, assuming direct labor hours were incurred evenly between the wool and cotton?

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 21:40, icemaniac
Tandard product costs deerfield company manufactures product m in its factory. production of m requires 2 pounds of material p, costing $4 per pound and 0.5 hour of direct labor costing, $10 per hour. the variable overhead rate is $8 per direct labor hour, and the fixed overhead rate is $12 per direct labor hour. what is the standard product cost for product m? direct material answer direct labor answer variable overhead answer fixed overhead answer standard product cost per unit answer
Answers: 1
image
Business, 22.06.2019 14:30, karleygirl2870
Your own record of all your transactions. a. check register b. account statement
Answers: 1
image
Business, 22.06.2019 20:30, allakhalilpea0zc
Caleb construction (cc) incurs supervisor salaries expense in the construction of homes. if cc manufactures 100 homes in a year, fixed supervisor salaries will be $400,000. with the current construction supervisors, cc's productive capacity is 150 homes in a year. however, if cc is contracts to build more than 150 homes per year, it will need to hire additional supervisors, which are hired as full-time rather than temporary employees. cc's productive capacity would then become 200 homes per year, and salaries expense would increase to $470,000. how would cc’s salaries expense be properly classified? fixed variable mixed stepped curvilinear
Answers: 3
image
Business, 23.06.2019 07:00, jimenagl
Witch design elements is used to organize used to organize the text in orderly fashion?
Answers: 1
You know the right answer?
EcoFabrics has budgeted overhead costs of $1,039,500. It has allocated overhead on a plantwide basis...

Questions in other subjects:

Konu
English, 24.12.2019 11:31
Konu
Mathematics, 24.12.2019 11:31