subject
Business, 16.04.2021 01:00 ggbvalde

Tidewater, Inc., requires its job applicants to take a test that measures their vocabulary and numerical skills. For specific jobs, the company also requires its applicants to perform a sample of the job. Before implementing the tests, the management analyzes how well the test actually correlates and predicts job performance. When Tidewater needed to downsize, the company helped employees who were laid off to get placed in other organizations, and immediate supervisors talked to the employees about the reasons for their dismissal. When the job applicants for specific jobs are asked to execute a sample of the job, the company is utilizing a(n) test.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 11:20, greatsavagebeast
Mae jong corp. issues $1,000,000 of 10% bonds payable which may be converted into 10,000 shares of $2 par value ordinary shares. the market rate of interest on similar bonds is 12%. interest is payable annually on december 31, and the bonds were issued for total proceeds of $1,000,000. in accounting for these bonds, mae jong corp. will: (a) first assign a value to the equity component, then determine the liability component. (b) assign no value to the equity component since the conversion privilege is not separable from the bond.(c) first assign a value to the liability component based on the face amount of the bond.(d) use the “with-and-without” method to value the compound instrument.
Answers: 3
image
Business, 22.06.2019 18:00, extraemy
Companies under market structures are independent
Answers: 2
image
Business, 22.06.2019 23:00, inucornspineapple
Type of deposit reserve requirementcheckable deposits $7.8 - 48.3 million 3%over $48.3 million 10noncheckable personal savings and time deposits 0refer to the accompanying table. if a bank has $60 million in savings deposits and $40 million in checkable deposits, then its required reserves are$1.2 million.
Answers: 1
image
Business, 23.06.2019 01:20, Athenax
Boxes of honey nut oatmeal are produced to contain 16.0 ounces, with a standard deviation of 0.20 ounce. for a sample size of 49, the 3-sigma -x chart control limits areupper control limit (ucl-x) = ounceslower control limit =(lcl=max
Answers: 1
You know the right answer?
Tidewater, Inc., requires its job applicants to take a test that measures their vocabulary and numer...

Questions in other subjects: