Describe the difference between a direct materials efficiency variance and a variable manufacturing overhead efficiency variance. A. A direct materials efficiency variance indicates whether more or less of the chosen allocation base was used than was budgeted for the actual output achieved. A variable manufacturing overhead efficiency variance indicates whether more or less direct materials were used than was budgeted for the actual output achieved. B. A direct materials efficiency variance indicates whether more or less direct materials were used than was budgeted for the static budget. A variable manufacturing overhead efficiency variance indicates whether more or less of the chosen allocation base was used than was budgeted for the static budget. C. A direct materials efficiency variance indicates whether more or less was paid for direct materials than was budgeted for the actual output achieved. A variable manufacturing overhead efficiency variance indicates whether more or less was paid for the chosen allocation base than was budgeted for the actual output achieved. D. A direct materials efficiency variance indicates whether more or less direct materials were used than was budgeted for the actual output achieved. A variable manufacturing overhead efficiency variance indicates whether more or less of the chosen allocation base was used than was budgeted for the actual output achieved.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 14:30, lilquanreem8051
Bridge building company estimates that it will incur $1,200,000 in overhead costs for the year. additionally, the company estimates 50,000 direct labor hours will be spent building custom walking bridges for the year at a total direct labor cost of $600,000. what is the predetermined overhead rate for bridge building company if direct labor costs are to be used as an allocation base?
Answers: 3
image
Business, 22.06.2019 15:10, GreenHerbz206
Paddock pools constructed a swimming pool and deck for the jensens' home. paddock installed the wrong trim on the pool. it would cost $2800 to change the trim-one-fifth of the total cost of the pool. the jensens refuse to pay anything for the pool. the paddock's best defense is: (a) duress (b) substanial performance (c)mistake (d) failure of conditions
Answers: 3
image
Business, 22.06.2019 16:30, AriaMartinez
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
image
Business, 22.06.2019 17:00, PlzNoToxicBan
Cadbury has a chocolate factory in dunedin, new zealand. for easter, it makes two kinds of “easter eggs”: milk chocolate and dark chocolate. it cycles between producing milk and dark chocolate eggs. the table below provides data on these two products. demand (lbs per hour) milk: 500 dark: 200 switchover time (minutes) milk: 60 dark: 30 production rate per hour milk: 800 dark: 800 for example, it takes 30 minutes to switch production from milk to dark chocolate. demand for milk chocolate is higher (500lbs per hour versus 200 lbs per hour), but the line produces them at the same rate (when operating): 800 lbs per hour. a : suppose cadbury produces 2,334lbs milk chocolate and 1,652 lbs of dark chocolate in each cycle. what would be the maximum inventory (lbs) of milk chocolate? b : how many lbs of milk and dark chocolate should be produced with each cycle so as to satisfy demand while minimizing inventory?
Answers: 2