Business, 12.03.2021 21:50 brittanyowusu1820
Using ABC product cost information when considering reducing cost, which of the following would not be a way to reduce activity costs?a. Improve operations so that the activity-base usage per unit is eliminated. b.Change the classification of employees doing an activity to decrease the activity rate. c.Switch to a plantwide allocation rate. d.Improve operations so that the activity-base usage per unit is reduced.
Answers: 3
Business, 21.06.2019 14:10, jzjzjzj
Needs 83,000 optical switches next year (assume same relevant range). by outsourcing them, worldsystems can use its idle facilities to manufacture another product that will contribute $ 140,000 to operating income, but none of the fixed costs will be avoidable. should worldsystems make or buy the switches? show your analysis.
Answers: 3
Business, 22.06.2019 02:30, llama1314
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
Using ABC product cost information when considering reducing cost, which of the following would not...
Mathematics, 21.10.2019 22:00
Physics, 21.10.2019 22:00