subject
Business, 01.02.2021 22:10 19thomasar

Wings Co. budgeted $555,600 manufacturing direct wages, 2,315 direct labor hours, and had the following manufacturing overhead: Overhead Cost Pool - Budgeted O/H $ - Budgeted Level for Cost Driver - O/H Cost Driver
Materials Handling $160,000 3,200 lbs. Material Weight
Machine Setup 13,200 390 S/U�s # of S/Us
Machine Repair 1,380 30,000 Mach. Hrs Machine Hrs.
Inspections 10,560 160 Inspections # of Inspections
Requirements for Job #971 which included 4 Units of Production:
D/L Hours = 20 Hours
D/Mat�ls = 130 lbs.
Machine S/U = 30 Set-ups
Machine Hrs. = 15,000 Machine Hours
Inspections = 15 Inspections.
Using ABC, the materials handling overhead cost assigned to Job #971 is:.
a. $2,300.
b. $990.
c. $6,500.
d. $690.
e. $1,020.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 09:40, nessross1018
Salt corporation's contribution margin ratio is 78% and its fixed monthly expenses are $30,000. assume that the company's sales for may are expected to be $89,000. required: estimate the company's net operating income for may, assuming that the fixed monthly expenses do not change.
Answers: 1
image
Business, 22.06.2019 11:10, henryzx900
How much are you willing to pay for a zero that matures in 10 years, has a face value of $1,000 and your required rate of return is 7%? round to the nearest cent. do not include a dollar sign in your answer. (i. e. if your answer is $432.51, then type 432.51 without $ sign)
Answers: 1
image
Business, 22.06.2019 12:00, elianagilbert3p3hh63
Areal estate agent is considering changing her cell phone plan. there are three plans to choose from, all of which involve a monthly service charge of $20. plan a has a cost of $.42 a minute for daytime calls and $.17 a minute for evening calls. plan b has a charge of $.52 a minute for daytime calls and $.15 a minute for evening calls. plan c has a flat rate of $80 with 275 minutes of calls allowed per month and a charge of $.38 per minute beyond that, day or evening. a. determine the total charge under each plan for this case: 150 minutes of day calls and 70 minutes of evening calls in a month. (do not round intermediate calculations. round your answer to 2 decimal places. omit the "$" sign in your response.)c. if the agent will use the service for daytime calls, over what range of call minutes will each plan be optimal? (round each answer to the nearest whole number. include the indifference point itself in each answer.)d. suppose that the agent expects both daytime and evening calls. at what point (i. e., percentage of total call minutes used for daytime calls) would she be indifferent between plans a and b?
Answers: 1
image
Business, 22.06.2019 14:00, ellisc7044
Why is efficiency an important economic goal?
Answers: 2
You know the right answer?
Wings Co. budgeted $555,600 manufacturing direct wages, 2,315 direct labor hours, and had the follow...

Questions in other subjects:

Konu
Mathematics, 27.12.2020 06:40
Konu
Mathematics, 27.12.2020 06:40