subject
Business, 21.01.2021 22:50 nyajah13

Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $13.00 per hour. The following information pertains to Job A-500: Direct materials $ 210 Direct labor $ 195 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 70 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 03:00, AllyJungkookie
In the supply-and-demand schedule shown above, at the lowest price of $50, producers supply music players and consumers demand music players.
Answers: 2
image
Business, 22.06.2019 19:40, cieloromero1
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
image
Business, 22.06.2019 22:40, deeknuk
Problem 3: access control pokeygram, a cutting-edge new email start-up, is setting up building access for its employees. there are two types of employees: managers and engineers, and there are three departments: security, networking, and human resoures. each employee works in a single department, and each department is housed on a different floor. managers are allowed access to any floor, while engineers are allowed access only to their own floor. there are three badge-operated elevators, each going up to only one distinct floor. every employee has one badge. pokeygram wants to use the best possible access control method in order to minimize delay for the elevators (a) access control matrix, 1. which of the following would you recommend that pokeygram use: (b) access control lists, or (c) capabilities? make sure to justify your answer. 2. what, if any, would be the benefits (and/or disadvantages) of using rbac (role-based access control) in this situation? keep your solution for this problem limited to 10-12 lines of text.
Answers: 2
image
Business, 22.06.2019 23:10, erykaa
Mbo works by objectives moving through the organization; that is, top managers set general organizational objectives, which are translated into divisional objectives, which are translated into departmental objectives. the hierarchy ends in individual objectives set by each employee. this is an example of mbo working as objectives through the organization.
Answers: 1
You know the right answer?
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its dire...

Questions in other subjects: