Business, 14.01.2021 17:00 kcceff4085
If a firm is following the cost leadership strategy, and overhead accounts are complex, then the: Firm should attempt to collect only material and labor costs. Firm should use a process costing system. Firm can use either a project or job costing system. Traditional volume-based job costing will not usually provide the needed cost accuracy. Only recourse is to install a hybrid costing system.
Answers: 3
Business, 21.06.2019 23:00, Tywan566
Each of the four independent situations below describes a sales-type lease in which annual lease payments of $12,500 are payable at the beginning of each year. each is a finance lease for the lessee. (fv of $1, pv of $1, fva of $1, pva of $1, fvad of $1 and pvad of $1) (use appropriate factor(s) from the tables provided.) situation 1 2 3 4 lease term (years) 3 3 3 3 asset’s useful life (years) 3 4 4 6 lessor’s implicit rate (known by lessee) 14 % 14 % 14 % 14 % residual value: guaranteed by lessee 0 $ 5,000 $ 2,500 0 unguaranteed 0 0 $ 2,500 $ 5,000 purchase option: after (years) none 2 3 3 exercise price n/a $ 7,500 $ 1,500 $ 3,500 reasonably certain? n/a no no yes
Answers: 1
Business, 22.06.2019 19:20, dayday0
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
If a firm is following the cost leadership strategy, and overhead accounts are complex, then the: Fi...
Physics, 23.11.2019 01:31
Mathematics, 23.11.2019 01:31