Washburn Company produces earbuds. During the year, manufacturing overhead costs are estimated to be $216,000. Estimated machine usage is 2,700 hours. The company assigns overhead based on machine hours. Job No. 551 used 90 machine hours.
Required:
a. Compute the predetermined overhead rate.
b. Determine the amount of overhead to allocate to Job No. 551.
c. Prepare the entry to assign overhead to Job No. 551 on January 15.
Answers: 1
Business, 22.06.2019 20:20, cjp271
Xinhong company is considering replacing one of its manufacturing machines. the machine has a book value of $39,000 and a remaining useful life of 5 years, at which time its salvage value will be zero. it has a current market value of $49,000. variable manufacturing costs are $33,300 per year for this machine. information on two alternative replacement machines follows. alternative a alternative b cost $ 115,000 $ 117,000 variable manufacturing costs per year 22,900 10,100 1. calculate the total change in net income if alternative a and b is adopted. 2. should xinhong keep or replace its manufacturing machine
Answers: 1
Business, 22.06.2019 23:00, tonya3498
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity. c. release work orders to the system at the bottleneck's capacity pace. d. increased bottleneck capacity is increased system capacity. e. bottlenecks should be moved to the end of the system process.
Answers: 1
Washburn Company produces earbuds. During the year, manufacturing overhead costs are estimated to be...
Mathematics, 08.02.2021 19:40
History, 08.02.2021 19:40
Mathematics, 08.02.2021 19:40
Mathematics, 08.02.2021 19:40
History, 08.02.2021 19:40
Mathematics, 08.02.2021 19:40