Business, 04.12.2020 17:00 Michael9979
Use Solver to find the combination of procedures that will result in the maximum possible profit per week in cell B7. Use the range name Optimal as the variable cells. Add these constraints in order: values in the named range Optimal are less than or equal to the values in the named range Max; values in the named range Optimal are whole numbers; values in the named range Procedures are less than or equal to values in the named range MaxAllowed. Run Solver and accept the solution.
Answers: 3
Business, 21.06.2019 21:00, july00
Accublade castings inc. casts blades for turbine engines. within the casting department, alloy is first melted in a crucible, then poured into molds to produce the castings. on may 1, there were 230 pounds of alloy in process, which were 60% complete as to conversion. the work in process balance for these 230 pounds was $32,844, determined as follows: exercises during may, the casting department was charged $350,000 for 2,500 pounds of alloy and $19,840 for direct labor. factory overhead is applied to the department at a rate of 150% of direct labor. the department transferred out 2,530 pounds of finished castings to the machining department. the may 31 inventory in process was 44% complete as to conversion. prepare the following may journal entries for the casting department: the materials charged to production the conversion costs charged to production the completed production transferred to the machining department determine the work in process"casting department may 31 balance.
Answers: 1
Business, 22.06.2019 07:20, staxeeyy767
Richardson hired j. c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j. c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
Business, 22.06.2019 07:40, tipbri6380
(a) what was the opportunity cost of non-gm food for many buyers before 2008? (b) why did they prefer the alternative? (c) what was the opportunity cost in 2008? (d) why did it change?
Answers: 3
Use Solver to find the combination of procedures that will result in the maximum possible profit per...
German, 31.08.2021 14:40
Business, 31.08.2021 14:40
Social Studies, 31.08.2021 14:40
Computers and Technology, 31.08.2021 14:40
History, 31.08.2021 14:40
Mathematics, 31.08.2021 14:40
Mathematics, 31.08.2021 14:40