The result of inspection of samples taken over the past 11 days is given below. The sample size is 100 per day. Day 1 2 3 4 5 6 7 8 9 10Defectives 7 9 9 11 7 8 0 11 13 2What are the upper and lower control limits?

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 11:00, mateoperkins
What is the advantage of developing criteria for assessing the effectiveness of business products and processes? a. assessment criteria are answers. b. assessment criteria are inexpensive. c. assessment criteria provide you with a list of relevant things to measure. d. assessment criteria provide you with a list of people to contact to learn more about process mentoring.
Answers: 3
image
Business, 22.06.2019 18:00, Aethis
Biochemical corp. requires $600,000 in financing over the next three years. the firm can borrow the funds for three years at 10.80 percent interest per year. the ceo decides to do a forecast and predicts that if she utilizes short-term financing instead, she will pay 7.50 percent interest in the first year, 12.15 percent interest in the second year, and 8.25 percent interest in the third year. assume interest is paid in full at the end of each year. a)determine the total interest cost under each plan. a) long term fixed rate: b) short term fixed rate: b) which plan is less costly? a) long term fixed rate plan b) short term variable rate plan
Answers: 2
image
Business, 22.06.2019 22:30, wbrandi118
The answer here, x=7, is not in the interval that you selected in the previous part. what is wrong with the work shown above?
Answers: 1
image
Business, 23.06.2019 02:00, brennarfa
Suppose that a major city’s main thoroughfare, which is also an interstate highway, will be completely closed to traffic for two years, from january 2014 to december 2015, for reconstruction at a cost of $535 million. if the construction company were to keep the highway open for traffic during construction, the highway reconstruction project would take much longer and be more expensive. suppose that construction would take four years if the highway were kept open, at a total cost of $800 million. the state department of transportation had to make its decision in 2014, one year before the start of construction (so that the first payment was one year away). so the department of transportation had the following choices: (i) close the highway during construction, at an annual cost of $267.5 million per year for two years. (ii) keep the highway open during construction, at an annual cost of $200 million per year for four years. now suppose the interest rate is 80%. calculate the present value of the costs incurred under each plan.