subject
Business, 24.11.2020 21:50 aprilpendergrass

Which stage of the funding life cycle would be most closely associated with funding amounts below $50,000

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 19:00, Samzell
Minolta inc. is considering a project that has the following cash flow and wacc data. what is the project's mirr? note that a project's projected mirr can be less than the wacc (and even negative), in which case it will be rejected. wacc: 10.00% year 0 1 2 3 4 cash flows -$850 300 $320 $340 $360
Answers: 3
image
Business, 21.06.2019 21:00, keke1871
While studying for the engineering economy final exam, you and two friends find yourselves craving a fresh pizza. you can't spare the time to pick up the pizza and must have it delivered. "pick-up-sticks" offers a 1-1/4-inch-thick (including toppings), 20-inch square pizza with your choice of two toppings for $15 plus 5% sales tax and a $1.50 delivery charge (no sales tax on delivery charge). "fred's" offers the round, deep-dish sasquatch, which is 20 inches in diameter. it is 1-3/4 inches thick, includes two toppings, and costs $17.25 plus 5% sales tax and free delivery. 1. what is the problem in this situation? state it in an explicit and precise manner. 2. systematically apply the seven principles of engineering economy (pp. 3-6) to the problem you have defined in part (a). 3. assuming that your common unit of measure is dollars (i. e., cost), what is the better value for getting a pizza based on the criterion of minimizing cost per unit of volume? 4. what other criteria might be used to select which pizza to purchase?
Answers: 3
image
Business, 21.06.2019 21:30, strikeboystorm
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
image
Business, 22.06.2019 17:40, bsheepicornozj0gc
Within the relevant range, if there is a change in the level of the cost driver, then a. total fixed costs will remain the same and total variable costs will change b. total fixed costs will change and total variable costs will remain the same c. total fixed costs and total variable costs will change d. total fixed costs and total variable costs will remain the same
Answers: 3
You know the right answer?
Which stage of the funding life cycle would be most closely associated with funding amounts below $5...

Questions in other subjects:

Konu
Mathematics, 19.11.2019 04:31
Konu
Mathematics, 19.11.2019 04:31