subject
Business, 20.11.2020 21:10 jmallory3031

Hey Ask a question about me

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 21:10, BABA3724
Auniversity spent $1.8 million to install solar panels atop a parking garage. these panels will have a capacity of 400 kilowatts (kw) and have a life expectancy of 20 years. suppose that the discount rate is 20%, that electricity can be purchased at $0.10 per kilowatt-hour (kwh), and that the marginal cost of electricity production using the solar panels is zero. hint: it may be easier to think of the present value of operating the solar panels for 1 hour per year first. approximately how many hours per year will the solar panels need to operate to enable this project to break even? a. a.3,696.48 b.14,785.92 c.9,241.20 if the solar panels can operate only for 8,317 hours a year at maximum, the project (would/would not)break even?
Answers: 1
image
Business, 22.06.2019 17:40, bsheepicornozj0gc
Within the relevant range, if there is a change in the level of the cost driver, then a. total fixed costs will remain the same and total variable costs will change b. total fixed costs will change and total variable costs will remain the same c. total fixed costs and total variable costs will change d. total fixed costs and total variable costs will remain the same
Answers: 3
image
Business, 22.06.2019 19:10, keenansimpkinsoy0oqc
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e. g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
image
Business, 23.06.2019 10:20, stormhorn5108
Is quadrilateral jklm the result of a dilation of quadrilateralabcd by a scale factor of 2? why or why not? o yes, because sides jk and ml are twice as long assides ab and dc. yes, because both figures are parallelograms, socorresponding sides are parallelno, because sides jk and ml are not twice as long assides ab and dc. no, because sides jm and kl have different slopesfrom sides ad and bc.
Answers: 1
You know the right answer?
Hey Ask a question about me...

Questions in other subjects:

Konu
Mathematics, 21.05.2020 03:09