subject
Business, 27.10.2020 23:20 bbqchicken243

Why does Madison say the country is in

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 03:00, autumn8668
Afirm's before-tax cost of debt, rd, is the interest rate that the firm must pay on debt. because interest is tax deductible, the relevant cost of debt used to calculate a firm's wacc is the cost of debt, rd (1 – t). the cost of debt is used in calculating the wacc because we are interested in maximizing the value of the firm's stock, and the stock price depends on cash flows. it is important to emphasize that the cost of debt is the interest rate on debt, not debt because our primary concern with the cost of capital is its use in capital budgeting decisions. the rate at which the firm has borrowed in the past is because we need to know the cost of capital. for these reasons, the on outstanding debt (which reflects current market conditions) is a better measure of the cost of debt than the . the on the company's -term debt is generally used to calculate the cost of debt because more often than not, the capital is being raised to fund -term projects. quantitative problem: 5 years ago, barton industries issued 25-year noncallable, semiannual bonds with a $1,600 face value and a 8% coupon, semiannual payment ($64 payment every 6 months). the bonds currently sell for $845.87. if the firm's marginal tax rate is 40%, what is the firm's after-tax cost of debt? round your answer to 2 decimal places. do not round intermediate calcu
Answers: 3
image
Business, 22.06.2019 07:30, suyi14
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
image
Business, 22.06.2019 13:40, vanessam16
Salge inc. bases its manufacturing overhead budget on budgeted direct labor-hours. the variable overhead rate is $8.10 per direct labor-hour. the company's budgeted fixed manufacturing overhead is $74,730 per month, which includes depreciation of $20,670. all other fixed manufacturing overhead costs represent current cash flows. the direct labor budget indicates that 5,300 direct labor-hours will be required in september. the company recomputes its predetermined overhead rate every month. the predetermined overhead rate for september should be:
Answers: 3
image
Business, 22.06.2019 23:00, andersonmm22
The sign at the bank reads, "wait here for the first available teller," suggests the use of a waiting line system. a. multiple server, single phaseb. random server, single phasec. single server, multiphased. multiple server, multiphasee. dynamic server, single phase
Answers: 2
You know the right answer?
Why does Madison say the country is in...

Questions in other subjects:

Konu
Mathematics, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Business, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01
Konu
Chemistry, 16.09.2020 02:01
Konu
Mathematics, 16.09.2020 02:01