subject
Business, 18.08.2020 23:01 ayoismeisjjjjuan

On January 1, 2017, when the market interest rate was 14%, Luba Corporation issued bonds in the face amount of $500,000 with interest at 12% payable semiannually. The bonds mature
on December 31, 2026.
Required:
Calculate the bond discount at issuance. How much of the discount should be amortized by the
effective interest method on July 1, 2017?
I am confused about how Discount is calculated? What table if any do I have to refer to
Face value is $500,000
Discount (52,970)
Selling Price of bond $447,030

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 07:40, carliehanson9908
Alicia has a collision deductible of $500 and a bodily injury liability coverage limit of $50,000. she hits another driver and injures them severely. the case goes to trial and there is a verdict to compensate the injured person for $40,000 how much does she pay?
Answers: 1
image
Business, 22.06.2019 16:00, angelinaranee15
In a perfectly competitive market, the long-run market supply curve tends to be horizontal or nearly so. what is another way to state this fact? (a) market supply is much more elastic in the long run than the short run. (b) in the long run, average total cost is minimized. (c) in the long run, price equals marginal cost. (d) market supply is much less elastic in the long run than the short run.
Answers: 1
image
Business, 22.06.2019 21:00, TH3L0N3W0LF
The purpose of the transportation approach for location analysis is to minimize which of the following? a. total costsb. total fixed costsc. the number of shipmentsd. total shipping costse. total variable costs
Answers: 1
image
Business, 22.06.2019 23:00, tonya3498
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity. c. release work orders to the system at the bottleneck's capacity pace. d. increased bottleneck capacity is increased system capacity. e. bottlenecks should be moved to the end of the system process.
Answers: 1
You know the right answer?
On January 1, 2017, when the market interest rate was 14%, Luba Corporation issued bonds in the fac...

Questions in other subjects:

Konu
Mathematics, 09.01.2021 07:20
Konu
History, 09.01.2021 07:20