subject
Business, 05.08.2020 19:01 lilblackbird4

The Dolly Llama Farm keeps an average of 50 of those funny creatures on hand and each consumes a pound of grain a day, 365 days per year. Grain costs $12 for a 50 pound bag and it costs the farm $10 to make a run to the feed store to pick up an order, regardless of order size. It takes the feed store four days to acquire, mix, and bag the special blend of grains necessary to make the feed the Dolly Llama Farm prefers. Storage costs for the feed runs 15% of the unit cost as the cost of money, loss due to critters, and spoilage all add up. Refer to Scenario 9.10. There is some variability in how long it takes the feed store to whip up a batch of llama feed. The standard deviation of the feed prep is one day. The farm is willing to tolerate a 5% chance of running out of feed before they can get some more hauled in. The llamas would prefer a 0% chance, but they don't get a vote. What reorder point achieves the farm's objectives?
a) 246 pounds
b) 282 pounds
c) 304 pounds
d) 316 pounds

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 10:40, emojigirl5754
Two assets have the following expected returns and standard deviations when the risk-free rate is 5%: asset a e(ra) = 18.5% σa = 20% asset b e(rb) = 15% σb = 27% an investor with a risk aversion of a = 3 would find that on a risk-return basis. a. only asset a is acceptable b. only asset b is acceptable c. neither asset a nor asset b is acceptable d. both asset a and asset b are acceptable
Answers: 2
image
Business, 22.06.2019 17:30, tysisson9612
You should do all of the following before a job interview except
Answers: 2
image
Business, 22.06.2019 20:30, Roof55
When patey pontoons issued 4% bonds on january 1, 2018, with a face amount of $660,000, the market yield for bonds of similar risk and maturity was 5%. the bonds mature december 31, 2021 (4 years). interest is paid semiannually on june 30 and december 31?
Answers: 1
image
Business, 22.06.2019 22:00, KHaire6856
The following table gives the map coordinates and the shipping loads for a set of cities that we wish to connect through a central hub.,(7,(4,(7,(6,(2,( 2,) for the location of the proposed new central hub, the coordinates should be near: x==) if the shipments from city a double, for the location of the proposed new central hub, the coordinates should be near: x==.926.865.017.21
Answers: 1
You know the right answer?
The Dolly Llama Farm keeps an average of 50 of those funny creatures on hand and each consumes a pou...

Questions in other subjects:

Konu
Mathematics, 10.03.2021 05:40
Konu
Mathematics, 10.03.2021 05:40