manufactures two products: A and B. The company's accounting records revealed the following per-unit costs for direct materials and direct labor: Product A Product B Production volume (units) 4,000 5,000 Direct materials $40 $60 Direct labor: 2.5 hours at $10/hour $25 2 hours at $10/hour $20 Management is considering a shift to activity-based costing and gathered the following manufacturing overhead data: Expected Activity Activity Cost Pool Estimated OH Cost Activity cost driver Product A Product B Setups $240000 Number of setups 80 40 General factory $2350000 Direct labor hours 10,000 10,000 Machine processing $120000 Machine hours 2,000 1,000 Q: Suppose the company uses conventional job-order costing with a plantwide predetermined overhead rate and direct labor hours as the allocation base. Assuming that actual and expected direct labor hours are the same, what is the unit product cost of Product B under conventional job-order costing
Answers: 1
Business, 22.06.2019 11:30, levy72
10. lucy is catering an important luncheon and wants to make sure her bisque has the perfect consistency. for her bisque to turn out right, it should have the consistency of a. cold heavy cream. b. warm milk. c. foie gras. d. thick oatmeal. student d incorrect
Answers: 2
Business, 23.06.2019 09:40, thomisonariel9800
Max wants to open a basic checking account at his local bank. he needs to bring his and , along with a $50 deposit, to open the account.
Answers: 3
manufactures two products: A and B. The company's accounting records revealed the following per-unit...
Mathematics, 19.01.2020 19:31
English, 19.01.2020 19:31
Mathematics, 19.01.2020 19:31
Mathematics, 19.01.2020 19:31
Mathematics, 19.01.2020 19:31