subject
Business, 20.05.2020 13:58 micky956

Find the answer to the last general journal entry on December 31, 2017.

Jan. 1 Paid $287,600 cash plus $11,500 in sales tax and $1,500 in transportation (FOB shipping point) for a new loader. The loader is estimated to have a four-year life and a $20,600 salvage value. Loader costs are recorded in the Equipment account.
Jan. 3 Paid $4,800 to install air-conditioning in the loader to enable operations under harsher conditions. This increased the estimated salvage value of the loader by another $1,400.
Dec. 31 Recorded annual straight-line depreciation on the loader.

2017

Jan. 1 Paid $5,400 to overhaul the loader’s engine, which increased the loader’s estimated useful life by two years.
Feb. 17 Paid $820 to repair the loader after the operator backed it into a tree.
Dec. 31 Recorded annual straight-line depreciation on the loader.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 03:30, Emptypockets451
Joe said “your speech was really great, i loved it.” his criticism lacks which component of effective feedback? a) he did not recognize his ethical obligations b) he did not focus on behavior c) he did not stress the positive d) he did not offer any specifics
Answers: 2
image
Business, 22.06.2019 12:30, o11011195
Amap from a trade development commission or chamber of commerce can be more useful than google maps for identifying
Answers: 1
image
Business, 22.06.2019 14:30, karleygirl2870
Your own record of all your transactions. a. check register b. account statement
Answers: 1
image
Business, 22.06.2019 19:40, cieloromero1
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
You know the right answer?
Find the answer to the last general journal entry on December 31, 2017.

Jan. 1 Paid $287...

Questions in other subjects:

Konu
Mathematics, 16.01.2020 10:31