subject
Business, 25.04.2020 05:10 shongmadi77

NSDC has a contract to produce eight satellites to support a worldwide telephone system (for Alaska Telecom, Inc.) that allows individuals to use a single, portable telephone in any location on earth to call in and out. NSDC will develop and produce the eight units. NSDC has estimated that the R&D costs will be NOK (Norwegian Krone) 12,000,000. Material costs are expected to be NOK 6,000,000. They have estimated the design and production of the first satellite will require 100,000 labor hours and an Page 160Page 16180 percent improvement curve is expected. Skilled labor cost is NOK 300 per hour. Desired profit for all projects is 25 percent of total costs. How many labor hours should the eighth satellite require? How many labor hours for the whole project of eight satellites? What price would you ask for the project? Why? Midway through the project your design and production people realize that a 75 percent improvement curve is more appropriate. What impact does this have on the project? Near the end of the project, Deutsch Telefon AG has requested a cost estimate for four satellites identical to those you have already produced. What price will you quote them? Justify your price.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 22:30, juanitarodriguez
True or false: on january 1, year one, the epstein corporation buys a plot of land with a four-story office building. the company believes the building is worth $1.9 million and has an estimated life of twenty years (with no anticipated residual value). the straight-line method is used. the land has an assessed value of $100,000. because the seller was interested in a quick sale, epstein was able to buy this land and building for $1.7 million. depreciation expense to be recognized in year one is $80,750.
Answers: 3
image
Business, 22.06.2019 07:40, perlacruz0505
Shelby company produces three products: product x, product y, and product z. data concerning the three products follow (per unit): product x product y product z selling price $ 85 $ 65 $ 75 variable expenses: direct materials 25.50 19.50 5.25 labor and overhead 25.50 29.25 47.25 total variable expenses 51.00 48.75 52.50 contribution margin $ 34.00 $ 16.25 $ 22.50 contribution margin ratio 40 % 25 % 30 % demand for the company’s products is very strong, with far more orders each month than the company can produce with the available raw materials. the same material is used in each product. the material costs $8 per pound, with a maximum of 4,400 pounds available each month. required: a. compute contribution margin per pound of materials used. (round your intermediate calculations and final answers to 2 decimal places.) contribution margin per pound product x $ product y $ product z $ b. which orders would you advise the company to accept first, those for product x, for product y, or for product z? which orders second? third? product x product y product z
Answers: 3
image
Business, 22.06.2019 15:20, ashleyuchiha123
Gulliver travel agencies thinks interest rates in europe are low. the firm borrows euros at 5 percent for one year. during this time period the dollar falls 11 percent against the euro. what is the effective interest rate on the loan for one year? (consider the 11 percent fall in the value of the dollar as well as the interest payment.)
Answers: 2
image
Business, 22.06.2019 17:00, HourlongNine342
Serious question, which is preferred in a business? pp or poopoo?
Answers: 1
You know the right answer?
NSDC has a contract to produce eight satellites to support a worldwide telephone system (for Alaska...

Questions in other subjects:

Konu
Mathematics, 21.05.2021 18:30
Konu
Mathematics, 21.05.2021 18:30
Konu
History, 21.05.2021 18:30
Konu
Mathematics, 21.05.2021 18:30