subject
Business, 24.04.2020 20:21 rhineharttori

I will apply for the government loan. I expect that will contribute xx dollars. That will bring our breakeven down so we have breathing room. That means that over and above our monthly retainer income of tbd ($30,500), we will need approximately $55k/month to be at breakeven where breakeven has been lowered by a 30 day rent reduction that I believe I can extend for one more month. I've combed through your expenses and there are no other major expense categories where we can reduce in any meaningful way. We may get some benefits from working virtually but I don’t have the data yet. So, the question is, can you identify roughly $55k in revenue above the $30.5k of monthly flat fees.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 14:40, aliviafrancois2000
Castillo corporation, a manufacturer, reports costs for the year as follows: direct materials used $735,000 wages to line workers 510,000 office rent 26,000 indirect materials used 700,000how much is the total period costs for castillo? $735,000 $510,000 $26,000 $700,000
Answers: 3
image
Business, 22.06.2019 02:30, llama1314
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
image
Business, 22.06.2019 10:30, drejones338p04p2p
How are interest rates calculated by financial institutions? financial institutions generally calculate interest as (1) interest or (.
Answers: 1
image
Business, 22.06.2019 19:10, keenansimpkinsoy0oqc
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e. g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
You know the right answer?
I will apply for the government loan. I expect that will contribute xx dollars. That will bring our...

Questions in other subjects:

Konu
Mathematics, 20.11.2020 22:40
Konu
History, 20.11.2020 22:40