Business, 21.04.2020 21:54 trodmanmalachip2yn26
A company bases its predetermined overhead rate on direct labor cost. For next year, total factory overhead cost is estimated at $300,000 and total direct labor cost is estimated at $240,000. For the first month of the year, actual factory overhead cost was $20,000 and actual direct labor cost was $15,000. What amount of overhead will be allocated/applied/assigned to production this month?
Answers: 3
Business, 22.06.2019 04:00, neariah24
Assume that the following conditions exist: a. all banks are fully loaned up- there are no excess reserves, and desired excess reserves are always zero. b. the money multiplier is 5 . c. the planned investment schedule is such that at a 4 percent rate of interest, investment =$1450 billion. at 5 percent, investment is $1420 billion. d. the investment multiplier is 3 . e.. the initial equilibrium level of real gdp is $12 trillion. f. the equilibrium rate of interest is 4 percent now the fed engages in contractionary monetary policy. it sells $1 billion worth of bonds, which reduces the money supply, which in turn raises the market rate of interest by 1 percentage point. calculate the decrease in money supply after fed's sale of bonds: $nothing billion.
Answers: 2
Business, 22.06.2019 07:20, staxeeyy767
Richardson hired j. c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j. c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
A company bases its predetermined overhead rate on direct labor cost. For next year, total factory o...
Mathematics, 06.03.2020 19:35
Physics, 06.03.2020 19:35
Social Studies, 06.03.2020 19:35
Mathematics, 06.03.2020 19:35