subject
Business, 15.04.2020 22:30 sloth53

The current conveyor-paced assembly line configuration assigns the workers in the following way: • Worker 1: Task 1 • Worker 2: Task 2 • Worker 3: Tasks 3, 4 • Worker 4: Tasks 5, 6 a. What is the capacity of the current line? b. Now assume that tasks are allocated to maximize capacity of the line, subject to the conditions that (1) a worker can only perform two adjacent operations and (2) all tasks need to be done in their numerical order. What is the capacity of this line now? c. Now assume that tasks are allocated to maximize capacity of the line and that tasks can be performed in any order. What is the maximum capacity that can be achieved?

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 16:30, lishalarrickougdzr
ernst's electrical has a bond issue outstanding with ten years to maturity. these bonds have a $1,000 face value, a 5 percent coupon, and pay interest semiminusannually. the bonds are currently quoted at 96 percent of face value. what is ernst's pretax cost of debt?
Answers: 1
image
Business, 22.06.2019 06:00, Tayj91
Why might a business based on a fad be a good idea? question 2 options: fads bring in the most customers. some fads are longer lasting than expected. fads have made some business owners incredibly wealthy. fads can take a business in a new direction.
Answers: 2
image
Business, 22.06.2019 11:20, smn43713
Which stage of group development involves members introducing themselves to each other?
Answers: 3
image
Business, 22.06.2019 12:30, victorialeona81
Provide an example of open-ended credit account that caroline has. caroline blue's credit report worksheet.
Answers: 1
You know the right answer?
The current conveyor-paced assembly line configuration assigns the workers in the following way: • W...

Questions in other subjects:

Konu
Mathematics, 08.07.2019 03:00
Konu
Mathematics, 08.07.2019 03:00