subject
Business, 08.04.2020 03:31 2005AngelMoore

The big difference between business process reengineering and continuous improvement programs such as TQM or Six Sigma is that A. A) reengineering is a tool for installing process organization, whereas TQM and Six Sigma concern defect-free production methods and delivering world-class customer service. B. E) reengineering represents an effort to totally revamp a firm's value chain, whereas TQM looks at incrementally improving the performance of two or three targeted value chain activities. C. C) reengineering is a tool for achieving one-time quantum improvements, whereas TQM and Six Sigma programs aim at incremental progress improvement (striving for inch-by-inch gains again and again in a never-ending stream). D. D) business process reengineering requires benchmarking, whereas TQM and Six Sigma do not. E. B) reengineering helps create core competencies, whereas TQM and Six Sigma are tools for making a core competence stronger and more efficient.

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 19:50, ahoney2233
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
image
Business, 22.06.2019 20:30, jessicaisbaehood
Juanita and sam attend a beach party and notice that the local beach appears to have a great deal more trash washed up on shore than it did when they were young. the water doesn't appear nearly as clear, and there seems to be less evidence of small water creatures living in the shallows. an afternoon at the local library convinces them that one major cause is the new factory nearby. after some discussion, they decide their next step should be identifying the cause of the changes identifying the problem picketing the guilty factory lobbying their elected representatives to complain about the problem talking to a local environmental group about solutions
Answers: 3
image
Business, 22.06.2019 20:30, anilauferc
You are in the market for a new refrigerator for your company’s lounge, and you have narrowed the search down to two models. the energy efficient model sells for $700 and will save you $45 at the end of each of the next five years in electricity costs. the standard model has features similar to the energy efficient model but provides no future saving in electricity costs. it is priced at only $500. assuming your opportunity cost of funds is 6 percent, which refrigerator should you purchase
Answers: 3
image
Business, 22.06.2019 20:40, julio38
If the ceo of a large, diversified, firm were filling out a fitness report on a division manager (i. e., "grading" the manager), which of the following situations would be likely to cause the manager to receive a better grade? in all cases, assume that other things are held constant. a. the division's basic earning power ratio is above the average of other firms in its industry. b. the division's total assets turnover ratio is below the average for other firms in its industry. c. the division's debt ratio is above the average for other firms in the industry. d. the division's inventory turnover is 6, whereas the average for its competitors is 8.e. the division's dso (days' sales outstanding) is 40, whereas the average for its competitors is 30.
Answers: 1
You know the right answer?
The big difference between business process reengineering and continuous improvement programs such a...

Questions in other subjects:

Konu
Mathematics, 17.06.2020 20:57
Konu
Mathematics, 17.06.2020 20:57