subject
Business, 27.03.2020 22:19 allieballey0727

Products is considering producing toy action figures and sandbox toys. The products require different specialized machines, each costing $1.1 million. Each machine has a five-year life and zero residual value. The two products have different patterns of predicted net cash inflows: LOADING...(Click the icon to view the data.) Calculate the sandbox toy project's payback period. If the sandbox toy project had a residual value of $ 200 comma 000, would the payback period change? Explain and recalculate if necessary. Does this investment pass Toy Universe's payback period screening rule?

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 14:20, kevinglvz
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
image
Business, 22.06.2019 15:30, graciemccain
On january 15, the end of the first biweekly pay period of the year, north company’s payroll register showed that its employees earned $32,000 of sales salaries. withholdings from the employees’ salaries include fica social security taxes at the rate of 6.2%, fica medicare taxes at the rate of 1.45%, $3,000 of federal income taxes, $772 of medical insurance deductions, and $260 of union dues. no employee earned > $7,000 in this first period. prepare the journal entry to record north company’s january 15 (employee) payroll expenses and liabilities.
Answers: 3
image
Business, 22.06.2019 18:30, miller5452
Amanufacturer has paid an engineering firm $200,000 to design a new plant, and it will cost another $2 million to build the plant. in the meantime, however, the manufacturer has learned of a foreign company that offers to build an equivalent plant for $2,100,000. what should the manufacturer do?
Answers: 1
image
Business, 22.06.2019 22:20, arisworlld
With q7 assume the sweet company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. and for q 10,11,13,and 14,assume that the company use department predetermined overhead rates with machine-hours as the allocation bade in both departements.7. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answers to nearest whole dollar.)total price for the job for job p -job q selling price per unit for job p q . how much manufacturing overhead was applied from the molding department to job p and how much was applied to job q? (do not round intermediate calculations.) job p job q manufacturing overhead applied for job p for job q . how much manufacturing overhead was applied from the fabrication department to job p and how much was applied to job q? (do not round intermediate calculations.)job p job q manufacturing overhead applied for job p for job q . if job q included 30 units, what was its unit product cost? (do not round intermediate calculations. round your final answer to nearest whole dollar.)14. assume that sweeten company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. what selling price would the company have established for jobs p and q? what are the selling prices for both jobs when stated on a per unit basis assuming 20 units were produced for job p and 30 units were produced for job q? (do not round intermediate calculations. round your final answer to nearest whole dollar.)total price for the job p for job q selling price per unit for job p for job q
Answers: 1
You know the right answer?
Products is considering producing toy action figures and sandbox toys. The products require differen...

Questions in other subjects:

Konu
Mathematics, 09.06.2020 23:57
Konu
Mathematics, 09.06.2020 23:57
Konu
Mathematics, 09.06.2020 23:57
Konu
Mathematics, 09.06.2020 23:57
Konu
English, 09.06.2020 23:57