Becton Labs, Inc., produces various chemical compounds for industrial use. One compound, called Fludex, is prepared using an elaborate distilling process. The company has developed standard costs for one unit of Fludex, as follows: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials 2.30 ounces $ 17.00 per ounce $ 39.10 Direct labor 0.60 hours $ 13.00 per hour 7.80 Variable manufacturing overhead 0.60 hours $ 2.50 per hour 1.50 Total standard cost per unit $ 48.40 During November, the following activity was recorded related to the production of Fludex: Materials purchased, 11,500 ounces at a cost of $178,825. There was no beginning inventory of materials; however, at the end of the month, 3,150 ounces of material remained in ending inventory. The company employs 17 lab technicians to work on the production of Fludex. During November, they each worked an average of 160 hours at an average pay rate of $11.50 per hour. Variable manufacturing overhead is assigned to Fludex on the basis of direct labor-hours. Variable manufacturing overhead costs during November totaled $3,000. During November, the company produced 3,500 units of Fludex. Required: 1. For direct materials: a. Compute the price and quantity variances. b. The materials were purchased from a new supplier who is anxious to enter into a long-term purchase contract. Would you recommend that the company sign the contract

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 19:10, victorialeverp714lg
Ms. sophia jones, the company president, has heard that there are multiple breakeven points for every product. she does not believe this and has asked you to provide the evidence of such a possibility. some information about the company for 2017 is as follows:
Answers: 1
image
Business, 21.06.2019 20:30, sjanem03
Which of the following statements regarding the learning curve and economies of scale is accurate? answers: just as diseconomies of scale are presumed to exist if a firm gets too large, there is a corresponding increase in costs in the learning-curve model as the cumulative volume of production grows. where diseconomies of scale are presumed to exist if a firm gets too large, there is no corresponding increase in costs in the learning-curve model as the cumulative volume of production grows. where diseconomies of scale are presumed to exist if a firm gets too small, there is no corresponding increase in costs in the learning-curve model as the cumulative volume of production grows. just as diseconomies of scale are presumed to exist if a firm gets too small, there is a corresponding increase in costs in the learning-curve model as the cumulative volume of production grows.
Answers: 1
image
Business, 21.06.2019 21:30, AquariusOx
Price and efficiency variances, journal entries. the schuyler corporation manufactures lamps. it has set up the following standards per finished unit for direct materials and direct manufacturing labor: direct materials: 10 lb. at $4.50 per lb. $45.00 direct manufacturing labor: 0.5 hour at $30 per hour 15.00 the number of finished units budgeted for january 2017 was 10,000; 9,850 units were actually produced. actual results in january 2017 were as follows: direct materials: 98,055 lb. used direct manufacturing labor: 4,900 hours $154,350 assume that there was no beginning inventory of either direct materials or finished units. during the month, materials purchased amounted to 100,000 lb., at a total cost of $465,000. input price variances are isolated upon purchase. input-efficiency variances are isolated at the time of usage. 1. compute the january 2017 price and efficiency variances of direct materials and direct manufacturing labor. 2. prepare journal entries to record the variances in requirement 1. 3. comment on the january 2017 price and efficiency variances of schuyler corporation. 4. why might schuyler calculate direct materials price variances and direct materials efficiency variances with reference to different points in time
Answers: 2
image
Business, 22.06.2019 04:00, callmedarthvadorplz
You are thinking of making your mansion more energy efficient by replacing some of the light bulbs with compact fluorescent bulbs, and insulating part or all of your exterior walls. each compact fluorescent light bulb costs $4 and saves you an average of $2 per year in energy costs, and each square foot of wall insulation costs $1 and saves you an average of $0.20 per year in energy costs.† your mansion has 150 light fittings and 3000 sq ft of uninsulated exterior wall. to impress your friends, you would like to spend as much as possible, but save no more than $750 per year in energy costs (you are proud of your large utility bills). how many compact fluorescent light bulbs and how many square feet of insulation should you purchase? how much will you save in energy costs per year? (if an answer does not exist, enter dne.)
Answers: 1
You know the right answer?
Becton Labs, Inc., produces various chemical compounds for industrial use. One compound, called Flud...

Questions in other subjects:

Konu
Mathematics, 27.08.2019 05:30