Parts arrive at a two-machine system according to an exponential interarrival distribution with a mean of 20 minutes. Upon arrival, the parts are sent to Machine 1 and processed. The processing-time distribution is TRIA (4.5, 9.3, 11) minutes. The parts are then processed at Machine 2 with the processing-time distribution as TRIA (16.4, 19.1, 20.8) minutes. The parts from Machine 2 are directed back to Machine 1 to be processed a second time with the same processing-time distribution but an independent draw from it. The completed parts then exit the system. There are transfer times between part arrival and Machine 1, between machines, and between the last Machine 1 and system exit. All parts transfer times are UNIF (1.5, 3.1).
Run the simulation for a single replication of 20,000 minutes to observe the average number in the machine queues and the average part cycle time with Arena Model.

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 14:00, mat1413
Will you use single-entry bookkeeping or double-entry bookkeeping? explain why.
Answers: 1
image
Business, 22.06.2019 14:20, kevinglvz
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
image
Business, 22.06.2019 14:30, crystalryan3797
What’s the present value of a perpetuity that pays $250 per year if the appropriate interest rate is 5%? $4,750 $5,000 $5,250 $5,513 $5,788what is the present value of the following cash flow stream at a rate of 8.0%, rounded to the nearest dollar? cash flows: today (t = 0) it is $750, after one year (t = 1) it is $2,450, at t = 2 it is $3,175, and at t=3 it is $4,400. draw a time line. $7,917 $8,333 $8,772 $9,233 $9,695
Answers: 2
image
Business, 22.06.2019 20:10, janayflowers042
Russell's is considering purchasing $697,400 of equipment for a four-year project. the equipment falls in the five-year macrs class with annual percentages of .2, .32, .192, .1152, .1152, and .0576 for years 1 to 6, respectively. at the end of the project the equipment can be sold for an estimated $135,000. the required return is 13.2 percent and the tax rate is 23 percent. what is the amount of the aftertax salvage value of the equipment assuming no bonus depreciation is taken
Answers: 2
You know the right answer?
Parts arrive at a two-machine system according to an exponential interarrival distribution with a me...

Questions in other subjects:

Konu
English, 08.04.2020 21:21
Konu
Mathematics, 08.04.2020 21:21