Business, 07.03.2020 01:12 TheViperMlg23676
The center of gravity method determines the best x and y coordinates for multiple faclities by finding a central location and then assigning the facilities around the periphery of that location. True or false?
Answers: 1
Business, 21.06.2019 16:10, Diego5140
Visburg concrete company pours concrete slabs for single-family dwellings. lancing construction company, which operates outside visburg's normal sales territory, asks visburg to pour 40 slabs for lancing's new development of homes. visburg has the capacity to build 300 slabs and is presently working on 250 of them. lancing is willing to pay only $3, 300 per slab. visburg estimates the cost of a typical job to include unit-level materials, $1, 440: unit-level labor, $720: and an allocated portion of facility-level overhead, $1, 200. required calculate the contribution to profit from the special order. should visburg accept or reject the special order to pour 40 slabs for $3, 300 each?
Answers: 2
Business, 21.06.2019 17:10, falabit
Which statement describes a monopoly? many firms produce identical products with no control over the market price. many firms produce differentiated products with control over market price. a single firm produces a product with no close substitutes and control over the market price. a single firm produces a product with many close substitutes and limited control over the market price.
Answers: 1
Business, 22.06.2019 06:00, esnyderquintero
Cash flow is often a problem for small businesses. how can an entrepreneur increase cash flow? a) locate lower-priced suppliers. b) forego sending in estimated tax payments to the irs c) shorten the terms on a bank loan to pay it off more quickly d) sell more low-margin items.
Answers: 1
Business, 22.06.2019 19:40, cieloromero1
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
The center of gravity method determines the best x and y coordinates for multiple faclities by findi...
Biology, 06.02.2021 14:00
English, 06.02.2021 14:00
Mathematics, 06.02.2021 14:00
English, 06.02.2021 14:00
Mathematics, 06.02.2021 14:00
History, 06.02.2021 14:00
Chemistry, 06.02.2021 14:00