subject
Business, 03.03.2020 22:26 osirisarellane3792

In March 2007March 2007, the U. S. unemployment rate was 4.44.4 percent. In August 2008 August 2008, the unemployment rate was 6.16.1 percent. Predict what happened to unemployment between March 2007March 2007 and August 2008 August 2008, if the labor force was constan

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 14:40, homework1911
Easel manufacturing budgeted fixed overhead costs of $ 1.50 per unit at an anticipated production level of 1 comma 350 units. in july easel incurred actual fixed overhead costs of $ 4 comma 700 and actually produced 1 comma 300 units. what is easel's fixed overhead budget variance for july?
Answers: 2
image
Business, 21.06.2019 21:30, ashl3yisbored
Gino's restaurant is a popular restaurant in boston, massachusetts. the owner of the restaurant has been trying to better understand costs at the restaurant and has hired a student intern to conduct an activity-based costing study. the intern, in consultation with the owner, identified the following major activities: activity cost pool activity measure serving a party of diners number of parties served serving a diner number of diners served serving drinks number of drinks ordered some costs, such as the cost of cleaning the linens that cover the restaurant's tables, vary with the number of parties served. other costs, such as washing plates and glasses, depends on the number of diners served or the number of drinks served. data concerning these activities are shown below. serving a party serving a dinner serving drinks total total cost $47,600 $153,000 $59,800 $260,400 total activity 7,000 parties 30,000 diners 46,000 drinks prior to the activity-based costing study, the owner knew very little about the costs of the restaurant. she knew that the total cost for the month was $260,400 and that 30,000 diners had been served. therefore, the average cost per diner was $8.68.required: 1. compute the activity rates for each of the three activities 2. according to the activity-based costing system, what is the total cost of serving each of the following parties of diners? a. a party of four diners who ordered three drinks in total b. a party of two diners who do not order any drinks c. a lone diner who orders two drinks 3. convert the total costs you computed in part (1) above to costs per diner. in other words, what is the average cost per diner for serving each of the following parties: a. a party of four diners who order three drinks in total b. a party of two diner who do not order any drinks c. a lone diner who orders two drinks 4. why do the costs per diner for the three different parties differ from each other and from the overall average coast of $9.80 per diner?
Answers: 1
image
Business, 22.06.2019 03:30, 3steves
Diversified semiconductors sells perishable electronic components. some must be shipped and stored in reusable protective containers. customers pay a deposit for each container received. the deposit is equal to the container’s cost. they receive a refund when the container is returned. during 2018, deposits collected on containers shipped were $856,000. deposits are forfeited if containers are not returned within 18 months. containers held by customers at january 1, 2018, represented deposits of $587,000. in 2018, $811,000 was refunded and deposits forfeited were $41,000. required: 1. prepare the appropriate journal entries for the deposits received and returned during 2018. 2. determine the liability for refundable deposits to be reported on the december 31, 2018, balance sheet.
Answers: 1
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
In March 2007March 2007, the U. S. unemployment rate was 4.44.4 percent. In August 2008 August 2008,...

Questions in other subjects:

Konu
Biology, 05.05.2020 08:25
Konu
Social Studies, 05.05.2020 08:25