subject
Business, 27.02.2020 02:04 kingk6440

A consumer has two basic choices: rent a DVD movie for $4.00 and spend 2 hours watching it, or spend $13 for a miniature golf game that takes 1 hour. If the marginal utilities of the movie and the miniature golf game are equal, and the consumer values time at $12 an hour, the rational consumer will most likely

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 13:50, veronica25681
When used-car dealers signal the quality of a used car with a warranty, a. buyers believe the signal because the cost of a false signal is high b. it is not rational to believe the signal because some used-car dealers are crooked c. the demand for lemons is eliminated d. the price of a lemon rises above the price of a good used car because warranty costs on lemons are greater than warranty costs on good used cars
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 21:10, kayleerichards666
Acompany has two products: standard and deluxe. the company expects to produce 36,375 standard units and 62,240 deluxe units. it uses activity-based costing and has prepared the following analysis showing budgeted cost and cost driver activity for each of its three activity cost pools. budgeted activity of cost driver activity cost pool budgeted cost standard deluxe activity 1 $ 93,000 2,500 5,250 activity 2 $ 92,000 4,500 5,500 activity 3 $ 87,000 3,000 2,800 what is the overhead cost per unit for the standard units? what is the overhead cost per unit for the deluxe units? (round activity rate and cost per unit answers to 2 decimal places.)activity expected costs expected activity driver activity rate1 93,000 2 92,000 3 87,000 standard activity activity driver activity rate allocated costs1 2 3
Answers: 2
image
Business, 23.06.2019 00:30, studybuddy0203
Emerson has an associate degree based on the chart below how will his employment opportunities change from 2008 to 2018
Answers: 3
You know the right answer?
A consumer has two basic choices: rent a DVD movie for $4.00 and spend 2 hours watching it, or spend...

Questions in other subjects:

Konu
Computers and Technology, 07.12.2019 14:31
Konu
Mathematics, 07.12.2019 14:31