subject
Business, 26.02.2020 02:08 mikeysoulemison

The estimates used to calculate the predetermined overhead rate will virtually always:

A. prove to be correct.
B. result in a year-end balance of zero in the Manufacturing Overhead account.
C. result in overapplied overhead that is closed to Cost of Goods Sold if it is immaterial in amount.
D. result in underapplied overhead that is closed to Cost of Goods Sold if it is immaterial in amount.
E. result in either underapplied or overapplied overhead that is closed to Cost of Goods Sold if it is immaterial in amount.

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 04:00, tmcdowell69
Don’t give me to many notifications because it will cause you to lose alot of points
Answers: 1
image
Business, 22.06.2019 07:40, perlacruz0505
Shelby company produces three products: product x, product y, and product z. data concerning the three products follow (per unit): product x product y product z selling price $ 85 $ 65 $ 75 variable expenses: direct materials 25.50 19.50 5.25 labor and overhead 25.50 29.25 47.25 total variable expenses 51.00 48.75 52.50 contribution margin $ 34.00 $ 16.25 $ 22.50 contribution margin ratio 40 % 25 % 30 % demand for the company’s products is very strong, with far more orders each month than the company can produce with the available raw materials. the same material is used in each product. the material costs $8 per pound, with a maximum of 4,400 pounds available each month. required: a. compute contribution margin per pound of materials used. (round your intermediate calculations and final answers to 2 decimal places.) contribution margin per pound product x $ product y $ product z $ b. which orders would you advise the company to accept first, those for product x, for product y, or for product z? which orders second? third? product x product y product z
Answers: 3
image
Business, 22.06.2019 12:50, tayjohn9774
Kendrick is leaving his current position at a company, and charlize is taking over. kendrick set up his powerpoint for easy access for himself. charlize needs to work in the program that is easy for her to use. charlize should reset advanced options
Answers: 3
image
Business, 22.06.2019 19:50, ahoney2233
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
You know the right answer?
The estimates used to calculate the predetermined overhead rate will virtually always:

...

Questions in other subjects: