subject
Business, 20.02.2020 23:28 joshajgaa

Look at the tables below, which show, respectively, the willingness to pay and willingness to accept of buyers and sellers of bags of oranges. For the following questions, assume that the equilibrium price and quantity will depend on the indicated changes in supply and demand. Assume that the only market participants are those listed by name in the two tables. Consumer Maximum Willingness to Pay Actual Price (Equilibrium Price)Bob $13 $8Barb 12 8Bill 11 8Bart 10 8Brent 9 8Betty 8 8Producer Minimum Acceptable Price Actual Price (Equilibrium Price)Carlos $3 $8Courtney 4 8Chuck 5 8Cindy 6 8Craig 7 8Chad 8 8Given that the equilibrium price is $8, what is the equilibrium quantity given the data displayed in the two tables?b. What if, instead of bags of oranges, the data in the two tables dealt with a public good like fireworks displays? If all the buyers free ride, what will be the quantity supplied by private sellers?Q* = .
c. Assume that we are back to talking about bags of oranges (a private good), but that the government has decided that tossed orange peels impose a negative externality on the public that must be rectified by imposing a $2-per-bag tax on sellers. What is the new equilibrium price?
P* = $.
What is the new equilibrium quantity?
Q* = bag(s).If the new equilibrium quantity is the optimal quantity, by how many bags were oranges being overproduced before?

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 12:40, payshencec21
Alarge tank is filled to capacity with 500 gallons of pure water. brine containing 2 pounds of salt per gallon is pumped into the tank at a rate of 5 gal/min. the well-mixed solution is pumped out at the same rate. find the number a(t) of pounds of salt in the tank at time t.
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 22.06.2019 22:00, ugh788o02
The company is experiencing an increase in competition, and at the same time they are building more production facilities in southeast asia. in this scenario, the top management team is most likely to multiple choice increase the cost of their products. restructure to reflect a more bureaucratic, stable organization. pull decision-making responsibility from low-level management, taking it on themselves. give lower-level managers the authority to make decisions to benefit the firm. rid themselves of all buffering product.
Answers: 3
image
Business, 23.06.2019 22:00, ybetancourt1
What is obscene is now determined by one uniform national standard. true or false?
Answers: 1
You know the right answer?
Look at the tables below, which show, respectively, the willingness to pay and willingness to accept...

Questions in other subjects: