Smith Foundry in Columbus comma Ohio, uses a predetermined manufacturing overhead rate to allocate overhead to individual jobs based on the machine hours required. At the beginning of the year, the company expected to incur the following: LOADING...(Click the icon to view the costs.) Requirements 1. Compute Smith's predetermined manufacturing overhead rate. 2. How much manufacturing overhead was allocated to jobs during the year? 3. How much manufacturing overhead was incurred during the year? Is manufacturing overhead underallocated or overallocated at the end of the year? By how much? 4. Were the jobs overcosted or undercosted? By how much?
Answers: 1
Business, 22.06.2019 12:30, bcarri4073
M. cotteleer electronics supplies microcomputer circuitry to a company that incorporates microprocessors into refrigerators and other home appliances. one of the components has an annual demand of 235 units, and this is constant throughout the year. carrying cost is estimated to be $1.25 per unit per year, and the ordering (setup) cost is $21 per order. a) to minimize cost, how many units should be ordered each time an order is placed? b) how many orders per year are needed with the optimal policy? c) what is the average inventory if costs are minimized? d) suppose that the ordering cost is not $21, and cotteleer has been ordering 125 units each time an order is placed. for this order policy (of q = 125) to be optimal, determine what the ordering cost would have to be.
Answers: 1
Smith Foundry in Columbus comma Ohio, uses a predetermined manufacturing overhead rate to allocate o...
History, 02.02.2021 21:40
Physics, 02.02.2021 21:40
Mathematics, 02.02.2021 21:40
Mathematics, 02.02.2021 21:40