subject
Business, 14.02.2020 20:41 edjiejwi

Rocky Mountain Corporation makes two types of hiking boots?Xactive and Pathbreaker. Data concerning these two product lines appear below:

Xactive Pathbreaker
Direct materials per unit $ 65.60 $ 51.80
Direct labor cost per unit $ 19.00 $ 13.80
Direct labor-hours per unit 1.4 DLHs 1 DLHs
Estimated annual production and sales 33,000 units 83,000 units
The company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below:

Estimated total manufacturing overhead $2,687,360
Estimated total direct labor-hours 129,200 DLHs

1-a. Compute the predetermined overhead rate based on direct labor-hours.
1-b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product.

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 05:50, mandy9386
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
image
Business, 22.06.2019 07:10, firdausmohammed80
mark, a civil engineer, entered into a contract with david. as per the contract, mark agreed to design and build a house for david for a specified fee. mark provided david with an estimation of the total cost and the contract was mutually agreed upon. however, during construction, when mark increased the price due to a miscalculation on his part, david refused to pay the amount. this scenario is an example of a mistake.
Answers: 1
image
Business, 22.06.2019 19:50, ParallelUniverse
Our uncle has $300,000 invested at 7.5%, and he now wants to retire. he wants to withdraw $35,000 at the end of each year, starting at the end of this year. he also wants to have $25,000 left to give you when he ceases to withdraw funds from the account. for how many years can he make the $35,000 withdrawals and still have $25,000 left in the end? a. 14.21b. 14.96c. 15.71d. 16.49e. 17.32
Answers: 1
image
Business, 22.06.2019 23:00, tonya3498
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity. c. release work orders to the system at the bottleneck's capacity pace. d. increased bottleneck capacity is increased system capacity. e. bottlenecks should be moved to the end of the system process.
Answers: 1
You know the right answer?
Rocky Mountain Corporation makes two types of hiking boots?Xactive and Pathbreaker. Data concerning...

Questions in other subjects: