subject
Business, 24.01.2020 20:31 zaygonegraduate

In the case below, the original source material is given along with a sample of student work. determine the type of plagiarism by clicking the appropriate radio button.

original source material

student version

there is a design methodology called rapid prototyping, which has been used successfully in software engineering. given similarities between software design and instructional design, we argue that rapid prototyping is a viable method for instructional design, especially for computer-based instruction.

references:
tripp, s. d., & bichelmeyer, b. a. (1990). rapid prototyping: an alternative instructional design strategy. educational technology research and development, 38(1), 31-44.

rapid prototyping could be an advantageous methodology for developing innovative computer-based instruction. software engineers have been successful in designing applications by using rapid prototyping. so it also could be an efficient way to do instructional design.

references:
tripp, s. d., & bichelmeyer, b. a. (1990). rapid prototyping: an alternative instructional design strategy. educational technology research and development, 38(1), 31-44.

which of the following is true for the student version above?

a)word-for-word plagiarism

b)paraphrasing plagiarism

c)this is not plagiarism

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 13:00, deedeesmoke113057
The triple bottom line represents also known as the
Answers: 1
image
Business, 22.06.2019 09:30, animexcartoons209
Factors like the unemployment rate, the stock market, global trade, economic policy, and the economic situation of other countries have no influence on the financial status of individuals. question 1 options: true false
Answers: 1
image
Business, 22.06.2019 19:40, apodoltsev2021
Aprimary advantage of organizing economic activity within firms is thea. ability to coordinate highly complex tasks to allow for specialized division of labor. b. low administrative costs because of reduced bureaucracy. c. eradication of the principal-agent problem. d. high-powered incentive to work as salaried employees for an existing firm.
Answers: 1
image
Business, 22.06.2019 21:50, preguntassimples
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
You know the right answer?
In the case below, the original source material is given along with a sample of student work. determ...

Questions in other subjects:

Konu
Mathematics, 26.02.2020 06:03