Given the following forecast and steady regular output of 550 every month, what total cost would result if overtime is limited to a maximum of 40 units a month, and subcontracting is limited to a maximum of 10 units a month?

unit costs are:
regular output = $20
overtime = $30
subcontract = $25
average balance inventory = $10
backlog = $18

month 1 2 3 4 5 6
forecast 540 540 570 590 600 580

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 07:10, firdausmohammed80
mark, a civil engineer, entered into a contract with david. as per the contract, mark agreed to design and build a house for david for a specified fee. mark provided david with an estimation of the total cost and the contract was mutually agreed upon. however, during construction, when mark increased the price due to a miscalculation on his part, david refused to pay the amount. this scenario is an example of a mistake.
Answers: 1
image
Business, 22.06.2019 15:00, cheyfaye4173
Oerstman, inc. uses a standard costing system and develops its overhead rates from the current annual budget. the budget is based on an expected annual output of 120,000 units requiring 480,000 direct labor hours.(practical capacity is 500,000 hours)annual budgeted overhead costs total $772,800, of which $556,800 is fixed overhead. a total of 119,300 units, using 478,000 direct labor hours, were produced during the year. actual variable overhead costs for the year were $260,400 and actual fixed overhead costs were $555,450.required: 1. compute the fixed overhead spending variance and indicate if favorable or unfavorable.2. compute the fixed overhead volume variance and indicate if favorable or unfavorable.
Answers: 3
image
Business, 22.06.2019 20:20, dd123984
Levine inc., which produces a single product, has prepared the following standard cost sheet for one unit of the product. direct materials (9 pounds at $1.80 per pound) $16.20 direct labor (6 hours at $14.00 per hour) $84.00 during the month of april, the company manufactures 270 units and incurs the following actual costs. direct materials purchased and used (2,500 pounds) $5,000 direct labor (1,660 hours) $22,908 compute the total, price, and quantity variances for materials and labor.
Answers: 2
image
Business, 22.06.2019 20:30, zachzach28280
Almeda products, inc., uses a job-order costing system. the company's inventory balances on april 1, the start of its fiscal year, were as follows: